Custom Molds

Issues faced by Custom Molds Inc.:

•    The delivery times on parts order were taking four to five weeks instead of the stated three weeks.
•    Number of defective products was on the rise.
•    Bottlenecks increased in the production process.
•    Changing strategies within their clients business needs changed order needs in an unexpected way.

There are two distinct processes taking place in the same facility and each process serves different customer needs. Below is the analysis of each the processes (Mold Fabrication and Parts Manufacturing) along with recommendations for the same.

1. MOLD FABRICATION PROCESS:

Mold fabrication is the core business of Custom Mold Inc., and the recommended process is shown in Exhibit 1. Mold Fabrication requires flexibility and quality; hence concept of Job Shop must be applied to streamline the process. Following are the Recommendations to do the same.

•    LAYOUT:

Similar equipment or function must be grouped together and the layout of the equipment must be designed so as to minimize the material handling, cost and work in process inventories. Digital numerically controlled equipment should be used as it gives flexibility to change set-ups on the various machines quickly. This will allow Custom Mold Inc. to compete on quality, speed, customization and new product introduction.

•    STANDARDIZATION:

To identify and eliminate bottlenecks, Custom Mold Inc must standardize all processes. This means that every task, every job, every event must be approached the same way each time it occurs. This includes a standard way of engineering, workholding, manufacturing and shipping. With sta ...
Word (s) : 1374
Pages (s) : 6
View (s) : 4933
Rank : 0
   
Report this paper
Please login to view the full paper